Hot:
2026-11-01 Xuchang | removal of old-style 2 rows, redone as 8mm2 rowsconnected liquid silicone beads
2026-10-28 Nantong | 7mm 1 rowconnected liquid silicone beads
2026-10-18 Ho Chi Minh City | 6.5mm+7mm 2 rows
2026-10-10 Ziyang | 7.5mm+8mm2 rows + 3 longjin
2026-09-05 Nantong | 6.5mm+7mm 2 rows
2026-09-04 Qingdao | 7.5mm 1 row
2026-09-03 Hezhou | 7mm+7.5mm 2 rows
2026-08-31 Menglian, Pu'er | existing 7mm 1 row, upgraded adding 8.5mm1 row
2026-08-27 Sihanoukville, Cambodia | 6.5mm+7mm 2 rows
2026-08-24 Korla | 7mm 1 row
2026-08-20 Dingxi | existing 7mm 1 row, upgraded adding 2 rows (now total 7mm3 rows)
2026-08-18 Xinzhou | 7mm 1 row
Copyright © 2018 Adu Pearling Lab XML